电缆桥架施工要求:
电缆桥架的现场施工条件一般比较恶劣,可能坐落开始建造的发电厂,也可能坐落开始正在建造的户外新建铁路,可能在桥架上,还可能在电缆桥架地道内,因为户外电缆桥架护套的修补都选用塑焊枪进行,并且塑焊枪的加热需求220V的交流电,而处于新兴建造的户外工程,现场一般都缺少电源,或许有电源可能因为现场电缆桥架的敷设方位的随即性,给电源的供给带来了必定的困难,因而要完成电缆桥架的护套的修补,一方面是人员的到位,另一方面主要是电源的供给,只要作好上述两件根底准备作业,才干完成电缆桥架护套修补作业的正常展开和进行。
The site construction conditions of the cable bridge are generally poor. It may be located in the power plant that started to build, or in the outdoor new railway that is being built. It may be on the bridge frame, or in the underground tunnel of the cable bridge, because the repair of the sheath of the outdoor cable bridge is carried out with plastic welding torch and the heating of the plastic welding torch. The demand for 220V AC power, and in newly built outdoor projects, the site is generally lack of power supply, perhaps the power supply may be due to the site cable bridge laying position of the randomness of the power supply has brought certain difficulties, so to complete the cable bridge sheath repair, on the one hand, the arrival of personnel, the other. The main aspect is the supply of power supply, as long as the above two pieces of preparation work, can complete the cable bridge sheath repair work to start and carry out normally.
为便于电缆桥架场修补作业的顺利进行,施工单位要装备有户外小型发电机。同时处于现场修补的方便现在供给的塑料焊枪的质量要过硬。喷头加热面积要大,并且加热速度要快。并且电缆桥架放线进程破损部位具有随机性,在一般的城市平和原地区,此项作业比较好展开,但是在一些山区地带,因为收到杂乱地势的影响,电缆桥架的修补作业其实是很困难的。因而要削减相应方面的投入和快速解决问题,一个很要害的问题是电缆桥架敷设进程人员的装备数量必须满足,并且选用正规的电缆桥架敷设设备进行正规放线,防止和削减电缆桥架放线进程中呈现护套破损的现象。
In order to facilitate the smooth progress of repairing work of cable bridge yard, the construction unit should equip with outdoor small generators. At the same time, it is convenient for on-site repair, and the quality of the plastic welding guns supplied now must be excellent. The nozzle has large heating area and fast heating speed. Moreover, the damaged parts of the cable bridge are random. In the plain areas of general cities, this work is better carried out. But in some mountainous areas, it is very difficult to repair the cable bridge because of the influence of the disordered terrain. Therefore, in order to reduce the corresponding investment and solve the problem quickly, a very important problem is that the number of equipment personnel in the cable bridge laying process must be met, and the use of regular cable bridge professional laying equipment for regular wiring, to prevent and reduce the cable bridge in the process of wiring sheath damage.
(The article was written by Shandong cable bridge manufacturer, more exciting content, welcome to pay attention to http://www.sdhangfeng.com)