整套的电缆桥架的敷设安装流程
在电缆桥架安装完成后,就要进行电缆的铺设,山东电缆桥架公司提示大家,电缆铺设我们要进行检查,严格按照规定程序进行,保证施工的质量和日后使用的可靠性。
After the installation of cable bridge is completed, cable laying should be carried out. Shandong Cable Bridge Company reminds you that cable laying should be inspected and carried out in strict accordance with the prescribed procedures to ensure the quality of construction and the reliability of future use.
一套合理的电缆桥架铺设顺序是这样的:
A reasonable sequence of cable bridge erection is as follows:
1、测量定位,确定安装桥架的支架安装位置,经检查确认支架合格后,才能安装桥架;
1. Measure and locate the position of the bracket to install the bridge. After checking and confirming that the bracket is qualified, the bridge can be installed.
2、桥架安装后也要经过检查,只有合格后才能进行电缆的敷设;
2. After the installation of the bridge frame, it should also be checked. Only after qualified can the cable be laid.
3、对于电缆,在敷设前进行绝缘测试合格,才能敷设;
3. For cable laying, the insulation test is qualified before laying.
4、电缆电气交接试验合格,且对接线去向、相位和防火隔堵措施等检查确认,才能通电。
4. Electrical connection test of cable is qualified, and check and confirm wiring direction, phase and fire-proof and blocking measures, etc. before power can be turned on.